Model 1015-12 Position 1.2L Bottles and PM-12 Deck Command |
| Operation Only a single-conductor hydrographic cable is required, since the CTD is taken off line automatically during the 10-second Rosette sampling sequence. Polarity of the Rosette can easily be changed by switches in the rack-mountable deck command box and electronic module in the underwater unit. Therefore, any CTD system now on the market can function with a G.O. Rosette system. Generally, the CTD system is attached with clamps or interconnecting plate just beneath the Rosette and protected by the Rosette stand. However, a number of CTD's have been mounted directly on the Rosette in place of a bottle (attachment supplied by General Oceanics). The engineering department at General Oceanics, Inc. will assist the customer in designing the best mounting configuration.
Deck Command Specifications 8.9 x 48.3 x 24.4 cm (3.5 x 19 x 10") panel rack mount. Polarity switch allows use of CTD. Voltage 110 VAC and 220 VAC. Illuminated bottle-trip confirmation numbers. Test sockets for sea cable and CTD. Remote trigger switch optional. Standard Order Standard order includes submersible array, hanger, deck command module, mount stand, adaptor plates, interconnecting cable and instruction manual. Order remote trigger additionally. Order depth sensor additionally. Maintenance Program (MRP-1) For a nominal charge the equipment may be returned annually for the following factory maintenance: (1) Disassembly, inspection and thorough cleaning of all mechanical parts of submersible array. (2) Refill pressure compensation oil in stepping motor chamber of submersible array. (3) Check and replacement as necessary of all O-ring seals within submersible array. (4) Inspection and electronic checkout of deck command unit. (5) Reassembly, lubrication and system test of submersible array and deck command unit. (6) Return of system to customer, shipping charges prepaid and added to your invoice as a separate line. Customer will be notified of any need for repairs along with an estimate for parts and labor costs. When feasible, system improvements introduced after purchase will be incorporated, upon customer approval of parts and labor costs. Upon completion of maintenance and repairs, the normal warranty on parts and labor will be renewed for another year. |
| |||||||